Loading...

SOH Wind Engineering was contracted by Ammann & Whitney as part of the replacement of the suspender ropes and rehabilitation of the main cables and cable strands.

Our role in the project was to investigate the current dynamics and wind loads of the bridge. Once these were determined, the proposed railing and sidewalk changes were evaluated to determine the feasibility. The project included two proposed sidewalk configurations and extreme wind estimation of the site.